Saturday, March 29, 2014

Word is Still Patience

For the most part, the basement is finished - still waiting on the pedestal sink for the bathroom that's been on back-order for weeks.  Just about ready to tell them to buy one off the floor at Home Depot!  This shot is from one end of the basement looking towards the kitchen cabinets.  I did have the antique table at the other end cleaned off, but managed to load more stuff on it today!  The quilt on the longarm was just finished -- our church is making quilts for the homeless and I quilt them, so that's what this one is.
This shot is from the other direction - also a bit messy!
This is the small room between the longarm room and the stairs - it'll be another small office after I bring the computer desk down and set up my old computer,  The door on the right goes to the big room, the one straight ahead goes to a small storage room.
This is same room from other direction.  Opening on left is to the big room; stairs are on the other side of the wall on the right, the door seen to the right goes to the furnace room and a large storage area.  The bathroom, if it ever gets finished is just on the other side of the stairs.  I managed to hang the quilt hangers, just haven't found the quilts I want to hang on them yet.  It's a work in progress!
I sincerely hope the bathroom will be finished soon -- it'll be much nicer not to have to run upstairs all the time!

Until next time....Blessings.

Monday, March 10, 2014

Patience

My word for 2014:  Patience!
The plan was that the carpet and vinyl for the bathroom and under the fridge would be installed on Saturday.  The actuality:  The carpet men arrived at 12:30 on Sunday.  The vinyl is in, but nothing else is even tacked down.  And I'm pretty sure they aren't coming back til next Saturday - nobody has called me because I'm pretty sure they know I'm not a happy camper!  The contractor can't finish until they're done with the carpet and the plumber can't finish until the contractor is finished trimming the bathroom.  So, my word for 2014:  Patience!

Until next time....blessings!

Thursday, March 06, 2014

R.I.P. JR

I had to have JR put to sleep yesterday.  He was down to 9 pounds and very ill.  We've been through a lot together, but I couldn't let him suffer.  I'm actually doing okay.  I never considered it, but it has given me some freedom -- I actually used to plan things around taking care of him, so now I only have myself to take care of.
Actually drove to Wisconsin this morning to have breakfast with my daughter!

Until next time...blessings.

Monday, March 03, 2014

Moving Along

This is the cabinet the contractor added to my kitchen while I was gone:  The bottom cabinet and countertop ended with the cabinet on the right.  The microwave on the shelf just hung out there in lala land!  So they matched the cabinets and installed the double cabinet on the left -- it doesn't really take away any space in the kitchen at all, but definitely adds much needed cabinet and counter space.
This week will see the rest of the woodwork finished in the basement, including staining 6 doors and the rest of the trim.  Saturday the flooring will be installed and next week the rest of the fixtures and trim will be installed.  I'm getting really anxious to see it all done.  My plan will be to put away the stuff I have all over the house first and then unpack the boxes still in the garage!

Until next time...blessings.